← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Central Bedfordshire

Flamingo Flowers

Application Withdrawn0.5 MWApplication CB/19/03775/FULLSubmitted 21 November 2019Withdrawn 12 May 2020

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
CB/19/03775/FULL
Planning authority
Central Bedfordshire
County or area
Bedfordshire
Nation
England
Technology
Solar
Capacity
0.5 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Standard Life Investments Property Holdings
Location
Flamingo Flowers, Great North Road, Sandy, Bedfordshire, SG19 2AJ
  • 21 November 2019 Planning application submitted
  • 12 May 2020 Application withdrawn

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 7.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof7.7 kmMinor
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium30 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough31 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near SG19 2AJ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Central Bedfordshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.