Awaiting Construction1080 MWApplication EN010115Submitted 25 March 2024Granted 17 December 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
EN010115
Planning authority
The Planning Inspectorate - National Infrastructure
County or area
Offshore
Nation
England
Technology
Offshore wind
Capacity
1080 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
RWE Renewables
Location
Five Estuaries Offshore Wind Farm, IP11
Turbines
79, 370 m to tip
  • 17 December 2015 Planning permission expired
  • 25 March 2024 Planning application submitted
  • 17 December 2025 Planning permission granted

The pack for this site lists 11 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0447, Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023, 76 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04472023Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 202376 kmMajor
EIR-07582024Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm378 kmSignificant
EIR-17782018Engineer loses arm during repair at North Sea Siemens Gamesa turbine378 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 8 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near IP11 is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in The Planning Inspectorate - National Infrastructure.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.