Solar · United Kingdom
Felixstowe Mega Distibution Centre - Photovoltaic Arrays
Operator Uniserve Group
Awaiting Construction2.5 MWData checked 16 November 2026Source record dated 3 January 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Felixstowe Mega Distibution Centre - Photovoltaic Arrays is a 2.5 MW solar farm on the edge of Felixstowe, Suffolk, United Kingdom. Its planning application (DC/22/2379/FUL) went to East Suffolk on 19 August 2022 and was granted on 2 December 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Felixstowe Mega Distibution Centre - Photovoltaic Arrays changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Felixstowe Mega Distibution Centre - Photovoltaic Arrays sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2815, Solar panel on school roof starts primary school fire in Ipswich, 15 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2815 | 2026 | Solar panel on school roof starts primary school fire in Ipswich | 15 km | Significant |
| EIR-2731 | 2021 | Electrical fault in solar panel control unit sparks loft fire in Ipswich | 15 km | Minor |
| EIR-2589 | 2022 | Rooftop solar panels reported to have overheated and sparked fire at Colchester church | 31 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 2.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Uniserve Group
- Location
- Felixstowe Mega Distibution Centre, Clickett Hill Road, Trimley St Mary, Felixstowe, Suffolk, IP11 4BA, United Kingdom
- Planning authority
- East Suffolk
- Planning application
- DC/22/2379/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DC/22/2379/FUL, with what the planning evidence pack adds for this site.
Every application in East Suffolk · Alerts for applications and incidents near here
Timeline
- 19 August 2022 Planning application submitted
- 2 December 2022 Planning permission granted
- 2 December 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Felixstowe Mega Distibution Centre - Photovoltaic Arrays. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Felixstowe Mega Distibution Centre - Photovoltaic Arrays had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Felixstowe Mega Distibution Centre - Photovoltaic Arrays; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Felixstowe Mega Distibution Centre - Photovoltaic Arrays?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 January 2023.
- Where is Felixstowe Mega Distibution Centre - Photovoltaic Arrays?
- On the edge of Felixstowe, Suffolk, United Kingdom (postcode IP11 4BA).