← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Sefton

Crossens Pumping Station - Solar Array

Awaiting Construction1 MWApplication 2021/0937/FULSubmitted 19 August 2021Granted 25 February 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
2021/0937/FUL
Planning authority
Sefton
County or area
Merseyside
Nation
England
Technology
Solar
Capacity
1 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Environment Agency
Location
Crossens Pumping Station Banks Road Banks, PR9
  • 19 August 2021 Planning application submitted
  • 25 February 2022 Planning permission granted
  • 25 February 2025 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school34 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent83 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall88 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PR9 is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Sefton.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.