← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · East Riding of Yorkshire

Carr Lane, Tickton - Solar Farm

Awaiting Construction49.9 MWApplication 22/03648/STPLFSubmitted 9 December 2022Granted on appeal 18 July 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/03648/STPLF
Planning authority
East Riding of Yorkshire
Nation
England
Technology
Solar
Capacity
49.9 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Albanwise Synergy Limited
Location
Carr Farm Carr Lane Tickton, Beverley, HU17 9SD
  • 9 December 2022 Planning application submitted
  • 6 December 2024 Planning permission refused
  • 18 July 2025 Planning permission granted
  • 18 July 2025 Appeal granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton41 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster58 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine100 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near HU17 9SD is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in East Riding of Yorkshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.