← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · South Cambridgeshire

Cambridge Wind Farm

Appeal Refused32 MWApplication S/1663/04/FSubmitted 10 August 2004Refused on appeal 8 December 2006

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
S/1663/04/F
Planning authority
South Cambridgeshire
County or area
Cambridgeshire
Nation
England
Technology
Onshore wind
Capacity
32 MW
Status
Appeal Refused
Operator or applicant
Your Energy
Location
L and South West of Huntingdon, Bosworth and Conningham
Appeal reference
S/1663/04/F
Turbines
16
  • 10 August 2004 Planning application submitted
  • 7 April 2005 Planning permission refused
  • 8 December 2006 Appeal refused

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1578, Wind turbine fire near Chumleigh in Devon, 10 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15782024Wind turbine fire near Chumleigh in Devon10 kmSignificant
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm11 kmSignificant
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms25 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Cambridge Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in South Cambridgeshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.