← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Cheshire West and Chester

Aston Grange Farm

Appeal Refused12 MWApplication 05-1059-fumSubmitted 20 June 2005Refused on appeal 5 November 2008

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
05-1059-fum
Planning authority
Cheshire West and Chester
County or area
Cheshire
Nation
England
Technology
Onshore wind
Capacity
12 MW
Status
Appeal Refused
Operator or applicant
Tegni Cymru
Location
Aston Grange Farm, Acton Bridge , Cheshire
Appeal reference
V/07/00025/REF
Turbines
4
  • 20 June 2005 Planning application submitted
  • 11 October 2006 Planning permission refused
  • 5 November 2008 Appeal refused

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0732, Nordex turbine damaged by suspected lightning strike at UK wind farm, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07322026Nordex turbine damaged by suspected lightning strike at UK wind farm34 kmMinor
EIR-16242026Crane topples on Scout Moor wind farm project64 kmMajor
EIR-08632017Fire destroys single turbine at Knabs Ridge wind farm near Harrogate107 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Aston Grange Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cheshire West and Chester.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.