Solar · United Kingdom

Aston Grange, Aston - Solar Panels & Battery Energy Storage System

Operator Innova Renewables · Owner Innova Capital Limited

Application Submitted20 MWData checked 16 November 2026Source record dated 24 March 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Aston Grange, Aston - Solar Panels & Battery Energy Storage System is a 20 MW solar farm 5 km east of Frodsham, Cheshire, United Kingdom. Its planning application (25/00100/FULEIA) went to Cheshire West and Chester on 24 February 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 36 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

INNOVA RENEWABLES LIMITED (12092691), active, since 2019. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Aston Grange, Aston - Solar Panels & Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool21 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells104 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire182 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Innova Renewables
Owner
Innova Capital Limited
Location
Aston Grange, Aston, Runcorn, Cheshire, WA7 3DG, United Kingdom
Planning authority
Cheshire West and Chester
Planning application
25/00100/FULEIA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00100/FULEIA, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 24 February 2025 Planning application submitted

None found. The register holds no published incident that names Aston Grange, Aston - Solar Panels & Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Aston Grange, Aston - Solar Panels & Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Aston Grange, Aston - Solar Panels & Battery Energy Storage System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Aston Grange, Aston - Solar Panels & Battery Energy Storage System?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 24 March 2025.
Where is Aston Grange, Aston - Solar Panels & Battery Energy Storage System?
5 km east of Frodsham, Cheshire, United Kingdom (postcode WA7 3DG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).