UPS stops after wrong cable connected during data centre power switchover

Nov 2019Published 12 Oct 2026Responsible editor: Chief Editor

Estimated damageModelled by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersLow confidence
out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden

Companies named in this entry: NTT Communications

On Monday 25 November 2019, a power failure occurred at 13:58 at a data centre operated by NTT Communications in Gifu Prefecture, Japan. The failure happened during switchover work on the data centre's power equipment. An excessive current was generated, and an uninterruptible power supply (UPS) forming part of the power equipment stopped. As a result, power could not be supplied to some customer equipment housed in the data centre.

The power equipment was restored first, and customer equipment was then brought back online in sequence. Service was restored at 19:35 the same day, an outage of 5 hours 37 minutes. The company attributed the cause to human error, in which an incorrect cable was connected during the switchover work. NTT Communications said it would review work processes and manuals to prevent recurrence.

The source attributes the incident to a human error during switchover work, in which the wrong cable was connected. The excessive current generated during the switchover caused the UPS to stop. The source does not say whether the switchover was checked or independently verified before work began.

  1. Verify every cable connection during power switchover work against a checked drawing, and use an independent second person to confirm the connections before energising.
  2. Include the UPS bypass and isolation steps in written method statements and rehearse them before live switchover work.
  3. Document the restoration sequence for customer equipment downstream of a UPS so that recovery after a trip is fast and orderly.

More lessons on electrical protection and isolation, outages, backup supply and restoration, from every incident on the register.

Published 2026-10-12. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Data centre incidents by year, free with a credit (PNG).

Data centre incidents in Japan: 5 entries, with a free alert for the next one.

Browse the full register or submit an incident.