Fuel oil spill from backup generator day tank at data processing site in Pantin, France

Mar 2022Published 12 Oct 2026Responsible editor: Chief Editor

Estimated damageModelled by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersLow confidence
out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden

At about 14:45 on 8 March 2022, a fuel oil leak occurred in the generator room of a data processing site in Pantin, Seine-Saint-Denis, France, according to the French accident database ARIA. The backup generator was running with a continuous demand for fuel. The site was evacuated to secure the affected area, absorbents were deployed, and drains that could carry pollution off site were isolated. Firefighters carried out initial pumping.

The following day a contractor cleaned up the site and pumped out the remaining fuel. About 1 cubic metre of domestic fuel oil escaped from the vent of the day tank, and 3.5 cubic metres of fuel mixed with water were recovered into a retention tank. Fixed-time rounds and forced mechanical ventilation were used to reduce vapours inside the room and outside. The fuel pump stopped automatically within a few minutes through the safety system beneath the day tank designed to contain accidental overflow.

According to ARIA, two concurrent defects were involved: a faulty level gauge that should have indicated high level and stopped filling, and a faulty relay controlling the filling sequence that started the filling pump. Fuel from the main tank was not stopped and was expelled through the nearest opening, the day tank vent. The high flow rate caused the leak within minutes.

  1. Fit an independent high-level cut-off on generator day tanks so that a single gauge or relay fault cannot allow overfilling.
  2. Include vent discharge paths and secondary containment in risk assessments for backup generator fuel systems.
  3. Require contractors to place any faulted installation in a manually secured state before starting work.
  4. Schedule periodic functional tests of level sensors and filling relays, not only visual inspection rounds.

More lessons on electrical protection and isolation, outages, backup supply and restoration, worker safety and safe systems of work, detection and monitoring, from every incident on the register.

Published 2026-10-12. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Data centre incidents in France, by year, free with a credit (PNG).

Data centre incidents in France: 8 entries, with a free alert for the next one.

Browse the full register or submit an incident.