Explosion at Los Angeles office building cuts power to twelve buildings
Aug 2015Published 4 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on other incidents in the United States, and an email when EIR-1998 is updated. No account needed; unsubscribe in one click.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Equinix
What happened
An explosion and fire occurred in the basement of 811 Wilshire Boulevard, a commercial and office building in downtown Los Angeles, at about 10:10 pm on Thursday 20 August 2015. Firefighters, reported as 160 or 161 depending on the source, brought the fire under control. Sources differ on the number of injured people: the Los Angeles Fire Department reported four people with minor injuries, while CBS Los Angeles reported two hospitalised and two with minor injuries.
Some occupants were helped out of the building. Blast damage ruptured pipes and left a large volume of water on the first sub-level. The Los Angeles Fire Department identified the damaged equipment as an on-site industrial power station. The loss of that station briefly left twelve surrounding buildings without power, which was restored on Friday 21 August. Equinix LA1 and CoreSite LA1 lost utility power and transferred to their own generators, while some network providers reported disruption.
The building was red-tagged by the Department of Building and Safety as unfit for occupancy until its electrical and fire-safety systems could be restored. The cause remains under investigation.
Contributing factors
The cause has not been established. Early reports placed the blast in a basement generator, but a representative of the building's landlord said that was untrue and that the building's generator sits in a parking structure across an alley. Blast damage to electrical and fire-safety systems led to the building being red-tagged.
Lessons learned
- Locate on-site power plant away from occupied and critical areas where possible, and review how a failure could damage electrical and fire-safety systems.
- Confirm that critical loads, including data centre power, transfer to standby generation as designed when utility supply is lost, and test this regularly.
- Plan for ruptured water pipes and flooding in sub-level plant rooms, and for the time needed to restore electrical and fire-safety systems before a building can be reoccupied.