Wind turbine blade breaks at Blood Hill in Somerton
2023Published 1 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on wind (onshore) incidents in the United Kingdom, and an email when EIR-1760 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What happened
Part of a wind turbine blade broke off and landed in a field amid strong winds during Storm Elin. The turbine is one of a pair built in 2015 at Blood Hill in Somerton near Great Yarmouth. The detached section landed about 20m from the tower on a Saturday, and the blade showed signs of damage. Blood Hill was the first wind farm built in Norfolk and was among the first operational in England in 1992.
Three other blades lying near the tower were covered in green algae, with long grass around them. The turbine was managed by E.on until 2012, when it was sold. The report does not name the current owner.
Contributing factors
Strong winds during Storm Elin. No other cause is reported.
Lessons learned
- After a named storm, check blades and the ground around towers for detached fragments.
- Distinguish newly failed parts from older blades already stored near a tower, so the failed element is correctly identified.
- Where a site has changed hands, keep a clear record of who is responsible for inspection and repair.
More lessons on weather and external hazards, structural integrity and turbines, from every incident on the register.
Source
Published 2026-10-01. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.