← Back to the list

Register / Wind (onshore) / EIR-1760
Wind (onshore)United KingdomEIR-1760

Wind turbine blade breaks at Blood Hill in Somerton

2023Published 1 Oct 2026

Part of a wind turbine blade broke off and landed in a field amid strong winds during Storm Elin. The turbine is one of a pair built in 2015 at Blood Hill in Somerton near Great Yarmouth. The detached section landed about 20m from the tower on a Saturday, and the blade showed signs of damage. Blood Hill was the first wind farm built in Norfolk and was among the first operational in England in 1992.

Three other blades lying near the tower were covered in green algae, with long grass around them. The turbine was managed by E.on until 2012, when it was sold. The report does not name the current owner.

Strong winds during Storm Elin. No other cause is reported.

  1. After a named storm, check blades and the ground around towers for detached fragments.
  2. Distinguish newly failed parts from older blades already stored near a tower, so the failed element is correctly identified.
  3. Where a site has changed hands, keep a clear record of who is responsible for inspection and repair.

Published 2026-10-01. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

Get the next one like this

One email when a newly reported incident is confirmed, at most two a day, plus a Monday digest. Free, no account needed, unsubscribe in one click.

By subscribing you agree to the privacy policy.

Related incidents

Wind (onshore) incidents in the United Kingdom: 42 entries, with a free alert for the next one.

Browse the full register or submit an incident.