Onshore wind · China
Yunnan Wenshan Pingba wind farm
Operational300 MWChecked 8 October 2026Last changed in the dataset 13 January 2025
The site
- Technology
- Onshore wind
- Capacity
- 300 MW
- Status
- Operational (Operating)
- Operator
- Datang New Energy (Wenshan)
- Owner
- China Water Conservancy and Hydropower Sixth Engineering Bureau Co Ltd [15%]; China Datang Corporation New Energy Co Ltd [85%]
- Location
- Baozhu, Wenshan AP, Yunnan, China
- First operating
- 2023
- Phases in the tracker
- 3
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Yunnan Wenshan Pingba wind farm. If you know of one, report it (confidential reports are anonymised).
Follow Yunnan Wenshan Pingba wind farm
Get one email when this site's status changes in the Global Energy Monitor solar and wind trackers, or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.