Around this site

← Back to Yunnan

Solar · China

Yunnan Shuangbai Bachong solar farm

Under construction100 MWChecked 8 October 2026Last changed in the dataset 24 November 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Yunnan Shuangbai Bachong solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
100 MW
Status
Under construction (Construction)
Operator
Shuangbai Yangtze River New Energy
Location
Tuodian Town, Chuxiong AP, Yunnan, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Yunnan Shuangbai Bachong solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.