Around this site

← Back to Yunnan

Solar · China

Yunnan Shidian Zhuoyang solar farm

Under construction165 MWChecked 8 October 2026Last changed in the dataset 24 November 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Yunnan Shidian Zhuoyang solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
165 MW
Status
Under construction (Construction)
Operator
Baoshan Shidian Zhuoyang New Energy Development
Owner
Beijing Jingneng International Holdings Co Ltd [100%]
Location
Youwang, Baoshan, Yunnan, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Yunnan Shidian Zhuoyang solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.