Yaupon Solar Project (Hybrid)

Operator Yaupon Solar, LLC

Operational200 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Yaupon Solar Project (Hybrid) is a 200 MW solar farm 24 km north-east of Cameron, Milam County, Texas, United States. It first operated in 2026. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 4 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 1 other site and 34 energy sites within 40 km for Yaupon Solar Project (Hybrid)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
200 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Yaupon Solar, LLC
Owner
Yaupon Solar, LLC
Location
Milam County, Texas, United States
First operating
2026
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

Status changed from Under construction to Operational on 26 October 2026.

None found. The register holds no published incident that names Yaupon Solar Project (Hybrid). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Yaupon Solar Project (Hybrid) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Yaupon Solar Project (Hybrid); it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Yaupon Solar Project (Hybrid)?
Operational, in the U.S. Energy Information Administration, Form EIA-860M, where it last changed on 26 October 2026.
Where is Yaupon Solar Project (Hybrid)?
24 km north-east of Cameron, Milam County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).