Around this site

← Back to Xinjiang

Onshore wind · China

Xinjiang Urumqi "Guaranteed Power Purchase" (TBEA) wind farm

Operational100 MWChecked 8 October 2026Last changed in the dataset 1 October 2024

Technology
Onshore wind
Capacity
100 MW
Status
Operational (Operating)
Operator
Urumqi County Junsheng Windpower Generation
Owner
TBEA Xinjiang New Energy Co Ltd [100%]
Location
Tuoli, Ürümqi, Xinjiang, China
First operating
2023

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang Urumqi "Guaranteed Power Purchase" (TBEA) wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.