Around this site

← Back to Xinjiang

Onshore wind · China

Xinjiang Qitai Beitashan (Beijing Energy/6Th Corps) wind farm

Operational100 MWChecked 8 October 2026Last changed in the dataset 5 April 2022

Technology
Onshore wind
Capacity
100 MW
Status
Operational (Operating)
Operator
Wujiaqu Jingneng New Energy
Location
Beitashan Ranch, Changji AP, Xinjiang, China
First operating
2016
Phases in the tracker
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang Qitai Beitashan (Beijing Energy/6Th Corps) wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.