Around this site

← Back to Xinjiang

Onshore wind · China

Xinjiang Dabancheng Jinrun Luyuan distributed wind farm

Operational49.5 MWChecked 8 October 2026Last changed in the dataset 17 October 2023

Technology
Onshore wind
Capacity
49.5 MW
Status
Operational (Operating)
Operator
Xinjiang Lixin Energy
Owner
SEPCOIII Electric POWER Construction Co Ltd [12%]; Xinjiang State-owned Capital Industrial Investment Fund Limited Partnership Enterprise [10%]; Xinjiang New Energy (Group) Co Ltd [63%]; unknown [7%];
Location
Dabancheng, Ürümqi, Xinjiang, China
First operating
2023

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang Dabancheng Jinrun Luyuan distributed wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.