Wye School, Kempe Centre - Solar Panels

Operator Wye School

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 7 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wye School, Kempe Centre - Solar Panels is a 0.2 MW solar farm 6.3 km north-east of Ashford, Kent, United Kingdom. Its planning application (NOT/2026/1101) went to Ashford on 24 June 2026 and was granted on 10 August 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 43 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wye School, Kempe Centre - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2069, Solar panel fire spreads through roof of new flats at Ebbsfleet, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20692021Solar panel fire spreads through roof of new flats at Ebbsfleet32 kmSignificant
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers55 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house56 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Wye School
Location
Wye School, Kempe Centre, Olantigh Road, Wye, Kent, TN25 5EJ, United Kingdom
Planning authority
Ashford
Planning application
NOT/2026/1101

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for NOT/2026/1101, with what the planning evidence pack adds for this site.

Every application in Ashford · Alerts for applications and incidents near here

  • 24 June 2026 Planning application submitted
  • 10 August 2026 Planning permission granted

None found. The register holds no published incident that names Wye School, Kempe Centre - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Wye School, Kempe Centre - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wye School, Kempe Centre - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wye School, Kempe Centre - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 October 2026.
Where is Wye School, Kempe Centre - Solar Panels?
6.3 km north-east of Ashford, Kent, United Kingdom (postcode TN25 5EJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).