Onshore wind · United Kingdom

Woodterrill Farm, Hollocombe - Wind Turbine Repowering

Operator Private Developer

Application SubmittedData checked 16 November 2026Source record dated 17 July 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Woodterrill Farm, Hollocombe - Wind Turbine Repowering is a wind farm 15 km south-east of Great Torrington, Devon, United Kingdom. Its planning application (1/0415/2026/FULM) went to Torridge on 12 June 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 8 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Woodterrill Farm, Hollocombe - Wind Turbine Repowering sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 86 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch86 kmSignificant
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales114 kmSignificant
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition158 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Private Developer
Location
Woodterrill Farm, Hollocombe, Chumleigh, Devon, EX18 7QF, United Kingdom
Planning authority
Torridge
Planning application
1/0415/2026/FULM
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 1/0415/2026/FULM, with what the planning evidence pack adds for this site.

Every application in Torridge · Alerts for applications and incidents near here

  • 12 June 2026 Planning application submitted

None found. The register holds no published incident that names Woodterrill Farm, Hollocombe - Wind Turbine Repowering. If you know of one, report it (confidential reports are anonymised).

Has Woodterrill Farm, Hollocombe - Wind Turbine Repowering had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Woodterrill Farm, Hollocombe - Wind Turbine Repowering; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Woodterrill Farm, Hollocombe - Wind Turbine Repowering?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 17 July 2026.
Where is Woodterrill Farm, Hollocombe - Wind Turbine Repowering?
15 km south-east of Great Torrington, Devon, United Kingdom (postcode EX18 7QF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).