← Back to Hessen
Planning pack for this site, £295Other options

Onshore wind · Germany

Windpark Graburg

Operator Windpark Graburg GmbH

Planned22.8 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Windpark Graburg is a 22.8 MW wind farm 9.6 km south-west of Treffurt, Ringgau, Werra-Meißner-Kreis, Hessen, Germany. It first operated in 2028. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 351 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Windpark Graburg sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-0346, Two workers die after work basket fall at Birstein wind turbine, Germany, 97 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-03462026Two workers die after work basket fall at Birstein wind turbine, Germany97 kmMajor
EIR-24052026Wind turbine blade falls after trailer overturns near Plettenberg156 kmMinor
EIR-13522023Turbine fire at Stemwede Bürgerwindpark in Germany185 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
22.8 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Windpark Graburg GmbH
Location
Ringgau, Werra-Meißner-Kreis, Hessen, 37296, Germany
First operating
2028
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Windpark Graburg. If you know of one, report it (confidential reports are anonymised).

Has Windpark Graburg had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names Windpark Graburg; it holds 30 incidents at wind farms in Germany.
What is the status of Windpark Graburg?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Windpark Graburg?
9.6 km south-west of Treffurt, Ringgau, Werra-Meißner-Kreis, Hessen, Germany (postcode 37296).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).