Onshore wind · Germany
Windpark Gedern Kommunalwald
Operator HessenEnergie Gesellschaft für rationelle Energienutzung mbH
Planned40.8 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Windpark Gedern Kommunalwald is a 40.8 MW wind farm 5.4 km south-west of Gedern, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 17 other energy sites within 10 km, 16 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 350 worldwide.
Get an email when Windpark Gedern Kommunalwald changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Windpark Gedern Kommunalwald sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-0346, Two workers die after work basket fall at Birstein wind turbine, Germany, 10.0 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0346 | 2026 | Two workers die after work basket fall at Birstein wind turbine, Germany | 10.0 km | Major |
| EIR-2405 | 2026 | Wind turbine blade falls after trailer overturns near Plettenberg | 130 km | Minor |
| EIR-0917 | 2013 | Enercon E126 blade break in Germany prompts fleet-wide turbine monitoring | 140 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 40.8 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Planned (In planning)
- Operator
- HessenEnergie Gesellschaft für rationelle Energienutzung mbH
- Location
- Gedern, Wetteraukreis, Hessen, 63688, Germany
- First operating
- 2027
- Turbines
- 6
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Windpark Gedern Kommunalwald. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Windpark Gedern Kommunalwald had a fire or other incident?
- None is on the register as of 10 November 2026. The register holds no published incident that names Windpark Gedern Kommunalwald; it holds 30 incidents at wind farms in Germany.
- What is the status of Windpark Gedern Kommunalwald?
- Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is Windpark Gedern Kommunalwald?
- 5.4 km south-west of Gedern, Germany (postcode 63688).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).