Onshore wind · United Kingdom
Wind Turbine in Plumbridge
Operator Cluckalclady Mountain Limited
Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 14 November 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Wind Turbine in Plumbridge is a 0.3 MW wind farm 13 km south-east of Strabane, Co. Derry & Strabane, United Kingdom. Its planning application (LA11/2023/1434/F) went to Derry City and Strabane on 9 March 2023 and was granted on 3 October 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 11 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Wind Turbine in Plumbridge changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wind Turbine in Plumbridge sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1038, Wind turbine reported to have collapsed in Northern Ireland during severe storm, 29 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1038 | 2017 | Wind turbine reported to have collapsed in Northern Ireland during severe storm | 29 km | Significant |
| EIR-0422 | 2025 | Wind turbine fire prompts fire service response in Fermanagh | 43 km | Minor |
| EIR-1134 | 2017 | Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire | 164 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Cluckalclady Mountain Limited
- Location
- North East of 103 Ligford Road, Plumbridge, Co. Derry & Strabane, BT79 8DW, United Kingdom
- Planning authority
- Derry City and Strabane
- Planning application
- LA11/2023/1434/F
- Turbines
- 1, 67 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA11/2023/1434/F, with what the planning evidence pack adds for this site.
Every application in Derry City and Strabane · Alerts for applications and incidents near here
Timeline
- 9 March 2023 Planning application submitted
- 3 October 2023 Planning permission granted
- 3 October 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Wind Turbine in Plumbridge. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Wind Turbine in Plumbridge had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wind Turbine in Plumbridge; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Wind Turbine in Plumbridge?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 November 2023.
- Where is Wind Turbine in Plumbridge?
- 13 km south-east of Strabane, Co. Derry & Strabane, United Kingdom (postcode BT79 8DW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).