Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Wind Turbine Development in Derrygonnelly

Operator Private Developer

Awaiting ConstructionData checked 16 November 2026Source record dated 21 July 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wind Turbine Development in Derrygonnelly is a wind farm 13 km west of Enniskillen, Co. Fermanagh & Omagh, United Kingdom. Its planning application (LA10/2025/0208/F) went to Fermanagh and Omagh on 26 February 2025 and was granted on 6 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 8 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wind Turbine Development in Derrygonnelly sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0422, Wind turbine fire prompts fire service response in Fermanagh, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04222025Wind turbine fire prompts fire service response in Fermanagh19 kmMinor
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm63 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire214 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
465m West of 240 Boho Road, Dooletter, Derrygonnelly, Co. Fermanagh & Omagh, BT74 5BP, United Kingdom
Planning authority
Fermanagh and Omagh
Planning application
LA10/2025/0208/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA10/2025/0208/F, with what the planning evidence pack adds for this site.

Every application in Fermanagh and Omagh · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 26 February 2025 Planning application submitted
  • 6 July 2026 Planning permission granted
  • 6 July 2031 Planning permission runs out

None found. The register holds no published incident that names Wind Turbine Development in Derrygonnelly. If you know of one, report it (confidential reports are anonymised).

Has Wind Turbine Development in Derrygonnelly had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wind Turbine Development in Derrygonnelly; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Wind Turbine Development in Derrygonnelly?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Wind Turbine Development in Derrygonnelly?
13 km west of Enniskillen, Co. Fermanagh & Omagh, United Kingdom (postcode BT74 5BP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).