Battery storage · United Kingdom
Willersey solar farm
Operator Belectric UK
Operational1 MWData checked 16 November 2026Source record dated 4 February 2019
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Willersey solar farm is a 1 MW battery storage site 8.1 km south-east of Evesham, Gloucestershire, United Kingdom. Its planning application (16/04853/FUL) went to Cotswold on 22 November 2016 and was granted on 23 December 2016. It has been operating since 1 February 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Willersey solar farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Co-located with RE)
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Belectric UK
- Location
- Land Parcel To The North Of The Byre Badsey Lane Willersey Gloucestershire, Gloucestershire, WR12 7PJ, United Kingdom
- Planning authority
- Cotswold
- Planning application
- 16/04853/FUL
- First operating
- 2019
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 16/04853/FUL, with what the planning evidence pack adds for this site.
Every application in Cotswold · Alerts for applications and incidents near here
Timeline
- 22 November 2016 Planning application submitted
- 23 December 2016 Planning permission granted
- 1 January 2019 Construction started
- 1 February 2019 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Willersey solar farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Willersey solar farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Willersey solar farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Willersey solar farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 February 2019.
- Where is Willersey solar farm?
- 8.1 km south-east of Evesham, Gloucestershire, United Kingdom (postcode WR12 7PJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).