Solar · United Kingdom

Peters Farm, Middle Hill - Solar Panels

Operator A D Brain & Son

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 8 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Peters Farm, Middle Hill - Solar Panels is a 0.2 MW solar farm 11 km south-east of Evesham, Gloucestershire, United Kingdom. Its planning application (24/01496/SPANOT) went to Cotswold on 21 May 2024 and was granted on 28 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 14 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Peters Farm, Middle Hill - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 35 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire35 kmSignificant
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home40 kmSignificant
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries41 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
A D Brain & Son
Location
Peters Farm, Middle Hill, Broadway, Gloucestershire, WR12 7LB, United Kingdom
Planning authority
Cotswold
Planning application
24/01496/SPANOT

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01496/SPANOT, with what the planning evidence pack adds for this site.

Every application in Cotswold · Alerts for applications and incidents near here

  • 21 May 2024 Planning application submitted
  • 28 June 2024 Planning permission granted

None found. The register holds no published incident that names Peters Farm, Middle Hill - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Peters Farm, Middle Hill - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Peters Farm, Middle Hill - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Peters Farm, Middle Hill - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2024.
Where is Peters Farm, Middle Hill - Solar Panels?
11 km south-east of Evesham, Gloucestershire, United Kingdom (postcode WR12 7LB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).