Solar · United Kingdom
Westgate Plaza One - Solar Photovoltaic Panels & Air Source Heat Pumps
Operator Barnsley Metropolitan Borough Council
Awaiting ConstructionData checked 16 November 2026Source record dated 27 October 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Westgate Plaza One - Solar Photovoltaic Panels & Air Source Heat Pumps is a solar farm in Barnsley, South Yorkshire, United Kingdom. Its planning application (2021/1257) went to Barnsley on 17 September 2021 and was granted on 22 October 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Westgate Plaza One - Solar Photovoltaic Panels & Air Source Heat Pumps changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Westgate Plaza One - Solar Photovoltaic Panels & Air Source Heat Pumps sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2771, Fire involves rooftop solar panels and lithium batteries on Bradford house roof, 29 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2771 | 2024 | Fire involves rooftop solar panels and lithium batteries on Bradford house roof | 29 km | Minor |
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 33 km | Significant |
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 68 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Barnsley Metropolitan Borough Council
- Location
- Westgate Plaza One, Westgate, Barnsley, South Yorkshire, S70 2DR, United Kingdom
- Planning authority
- Barnsley
- Planning application
- 2021/1257
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2021/1257, with what the planning evidence pack adds for this site.
Every application in Barnsley · Alerts for applications and incidents near here
Timeline
- 17 September 2021 Planning application submitted
- 22 October 2021 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Westgate Plaza One - Solar Photovoltaic Panels & Air Source Heat Pumps. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Westgate Plaza One - Solar Photovoltaic Panels & Air Source Heat Pumps had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Westgate Plaza One - Solar Photovoltaic Panels & Air Source Heat Pumps; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Westgate Plaza One - Solar Photovoltaic Panels & Air Source Heat Pumps?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 October 2021.
- Where is Westgate Plaza One - Solar Photovoltaic Panels & Air Source Heat Pumps?
- In Barnsley, South Yorkshire, United Kingdom (postcode S70 2DR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).