West Holcombe

Operator Wessex Solar Energy

Under Construction5.5 MWData checked 16 November 2026Source record dated 21 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

West Holcombe is a 5.5 MW solar farm 13 km north of Tiverton, Devon, United Kingdom. Its planning application (14/01452/MFUL) went to Mid Devon on 28 August 2014 and was granted on appeal on 24 June 2015. Construction started on 1 August 2020. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

WESSEX SOLAR ENERGY LIMITED (12226450), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for West Holcombe sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1486, Fire under solar panels at Broadclyst brought under control, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14862026Fire under solar panels at Broadclyst brought under control28 kmSignificant
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea39 kmMinor
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalow41 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
5.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Wessex Solar Energy
Location
Land at NGR 299298 125070 (East Of Bowdens Lane) Shillingford Devon, Devon, United Kingdom
Planning authority
Mid Devon
Planning application
14/01452/MFUL
Appeal reference
APP/Y1138/W/14/3001908

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01452/MFUL, with what the planning evidence pack adds for this site.

Every application in Mid Devon · Alerts for applications and incidents near here

  • 28 August 2014 Planning application submitted
  • 20 January 2015 Appeal lodged
  • 24 June 2015 Planning permission granted
  • 24 June 2015 Appeal granted
  • 1 August 2020 Construction started

None found. The register holds no published incident that names West Holcombe. If you know of one, report it (confidential reports are anonymised).

Has West Holcombe had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names West Holcombe; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of West Holcombe?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 21 September 2020.
Where is West Holcombe?
13 km north of Tiverton, Devon, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).