Solar · United Kingdom
West Hendon Estate, Plots A, C & G - 350 Apartments & Commercial Units
Operator Metropolitan Housing Trust & Barratt Homes
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 10 March 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
West Hendon Estate, Plots A, C & G - 350 Apartments & Commercial Units is a 0.2 MW solar farm 3 km west of Golders Green, London, United Kingdom. Its planning application (23/1802/FUL) went to Barnet on 25 April 2023 and was granted on 18 August 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 109 other energy sites within 10 km, 84 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when West Hendon Estate, Plots A, C & G - 350 Apartments & Commercial Units changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for West Hendon Estate, Plots A, C & G - 350 Apartments & Commercial Units sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1170, Rooftop solar panels catch fire at IKEA store in Wembley, 3.7 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1170 | 2025 | Rooftop solar panels catch fire at IKEA store in Wembley | 3.7 km | Significant |
| EIR-1514 | 2024 | Garage fire destroys solar panels in Southgate, with a battery storage fault suspected | 9.9 km | Minor |
| EIR-0774 | 2023 | Solar panel fire destroys roof of Ealing Council house in Greenford | 10 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Metropolitan Housing Trust & Barratt Homes
- Location
- West Hendon Estate, West Hendon, London, NW9 7DW, United Kingdom
- Planning authority
- Barnet
- Planning application
- 23/1802/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/1802/FUL, with what the planning evidence pack adds for this site.
Every application in Barnet · Alerts for applications and incidents near here
Timeline
- 25 April 2023 Planning application submitted
- 18 August 2024 Planning permission granted
- 18 August 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names West Hendon Estate, Plots A, C & G - 350 Apartments & Commercial Units. If you know of one, report it (confidential reports are anonymised).
Questions
- Has West Hendon Estate, Plots A, C & G - 350 Apartments & Commercial Units had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names West Hendon Estate, Plots A, C & G - 350 Apartments & Commercial Units; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of West Hendon Estate, Plots A, C & G - 350 Apartments & Commercial Units?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 March 2025.
- Where is West Hendon Estate, Plots A, C & G - 350 Apartments & Commercial Units?
- 3 km west of Golders Green, London, United Kingdom (postcode NW9 7DW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).