Planning pack for this site, £295Other options

Onshore wind · Germany

WEA07

Operator innoVent WP Esenshammergroden

Planned4.8 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

WEA07 is a 4.8 MW wind farm 8.6 km south-west of Nordenham, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 40 other energy sites within 10 km, 27 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 350 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for WEA07 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-0808, Nacelle fire at Rhede wind farm prompts Enercon investigation, 86 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08082018Nacelle fire at Rhede wind farm prompts Enercon investigation86 kmSignificant
EIR-13522023Turbine fire at Stemwede Bürgerwindpark in Germany114 kmSignificant
EIR-11892026Wind turbine on dike catches fire near Simonsberg116 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
4.8 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
innoVent WP Esenshammergroden
Location
Nordenham, Wesermarsch, Niedersachsen, 26954, Germany
First operating
2027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names WEA07. If you know of one, report it (confidential reports are anonymised).

Has WEA07 had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names WEA07; it holds 30 incidents at wind farms in Germany.
What is the status of WEA07?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is WEA07?
8.6 km south-west of Nordenham, Germany (postcode 26954).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).