Planning pack for this site, £295Other options

Onshore wind · Germany

WEA 03 Grevelau

Operator Windpark Grevelau GmbH & Co. KG

Planned7 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

WEA 03 Grevelau is a 7 MW wind farm 3.1 km west of Winsen, Germany. It first operated in 2028. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 23 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 351 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for WEA 03 Grevelau sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-2240, Nacelle fire on wind turbine at Bürgerwindpark Fehmarn, Germany, 140 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-22402026Nacelle fire on wind turbine at Bürgerwindpark Fehmarn, Germany140 kmSignificant
EIR-11892026Wind turbine on dike catches fire near Simonsberg145 kmMinor
EIR-18042023Wind turbine reported to have collapsed after a wind gust in Rostock, Germany154 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
7 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Windpark Grevelau GmbH & Co. KG
Location
Winsen (Luhe), Harburg, Niedersachsen, 21423, Germany
First operating
2028

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names WEA 03 Grevelau. If you know of one, report it (confidential reports are anonymised).

Has WEA 03 Grevelau had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names WEA 03 Grevelau; it holds 30 incidents at wind farms in Germany.
What is the status of WEA 03 Grevelau?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is WEA 03 Grevelau?
3.1 km west of Winsen, Germany (postcode 21423).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).