Onshore wind · United Kingdom
Viking Wind Farm
Operator Viking Energy Wind Farm
Operational443 MWData checked 16 November 2026Source record dated 24 January 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Viking Wind Farm is a 443 MW wind farm 21 km north of Lerwick, Shetland, United Kingdom. Its planning application (ECU00000723) went to Scottish Government (S36) on 14 November 2018 and was granted on 24 May 2019. It has been operating since 1 September 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 5 other energy sites within 10 km, 4 of them wind farms. The register holds 3 incidents at this site, the latest in 2024.
Incidents on the register at this site
3 incidents at Viking Wind Farm, from 2022 to 2024, 1 classed as major. Oldest first.
On 5 June 2022, a labourer was crushed while using a hammer to remove dried concrete from a skip at the Viking site on Upper Kergord in the Shetland Islands. The skip bale arm fell and pinned him against the chest. Colleagues raised the alarm and attempted...
A fire broke out in the early hours of 29 December, reported as 2023 by inference from the publication date, next to one of the turbines at the Viking Wind Farm on the Shetland Islands, Scotland. The 443MW onshore project, which was in development and under...
A blade on a Vestas turbine was damaged at the Viking wind farm in the United Kingdom, one of the UK's largest onshore wind farms. Project operator SSE Renewables confirmed the damage. The available report does not give the date of the damage, the cause, the...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Viking Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
29 settled days to 4 Nov: 21,608 MWh, running 55% of half hours, peak 55 MW of 443, load factor 7%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £189,619 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The site
- Technology
- Onshore wind
- Capacity
- 443 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Viking Energy Wind Farm
- Location
- Lang Kame, Shetland Island, Shetland, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00000723
- First operating
- 2024
- Turbines
- 103, 155 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00000723, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 14 November 2018 Planning application submitted
- 24 May 2019 Planning permission granted
- 1 August 2020 Construction started
- 1 September 2024 Operational
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Viking Wind Farm had a fire or other incident?
- Yes. The register holds 3 incidents that name it: Fatality at Viking wind farm site in Shetland Islands (EIR-1291, 2022); Fire at Viking Wind Farm construction site on Shetland (EIR-2512, 2023); Blade damaged on Vestas turbine at Viking wind farm (EIR-0754, 2024).
- What is the status of Viking Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 January 2022.
- Where is Viking Wind Farm?
- 21 km north of Lerwick, Shetland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).