← Back to Bayern

Solar · Germany

UW Kagers Ost BA 1 - Solarpark Steinach - Münster

Operator GSW Netz GmbH

Operational20 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

UW Kagers Ost BA 1 - Solarpark Steinach - Münster is a 20 MW solar farm 7.3 km north of Straubing, Steinach, Straubing-Bogen, Bayern, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 38 other energy sites within 10 km, 34 of them solar farms. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 458 worldwide.

The operator's 15 other sites and 350 energy sites within 40 km for UW Kagers Ost BA 1 - Solarpark Steinach - Münster

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
20 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Operational (In operation)
Operator
GSW Netz GmbH
Location
Steinach, Straubing-Bogen, Bayern, 94377, Germany
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

  • 15 September 2026 Operational

None found. The register holds no published incident that names UW Kagers Ost BA 1 - Solarpark Steinach - Münster. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has UW Kagers Ost BA 1 - Solarpark Steinach - Münster had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names UW Kagers Ost BA 1 - Solarpark Steinach - Münster; it holds 6 incidents at solar farms in Germany.
What is the status of UW Kagers Ost BA 1 - Solarpark Steinach - Münster?
Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is UW Kagers Ost BA 1 - Solarpark Steinach - Münster?
7.3 km north of Straubing, Steinach, Straubing-Bogen, Bayern, Germany (postcode 94377).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).