Onshore wind · United Kingdom
Upper Vaunces Wind Farm
Operator Upper Vaunces Wind Farm
Application Refused6 MWData checked 16 November 2026Source record dated 9 March 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Upper Vaunces Wind Farm is a 6 MW wind farm 8.1 km north-east of Diss, Norfolk, United Kingdom. Its planning application (2013/0725) went to South Norfolk on 26 April 2013 and was refused by the Secretary of State on 15 January 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 21 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Upper Vaunces Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Secretary of State - Refusal)
- Operator or applicant
- Upper Vaunces Wind Farm
- Location
- Land east of Semere Green Road (forming part of Upper Vaunces Farm), Norfolk, United Kingdom
- Planning authority
- South Norfolk
- Planning application
- 2013/0725
- Appeal reference
- APP/L2630/A/13/2203839
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2013/0725, with what the planning evidence pack adds for this site.
Every application in South Norfolk · Alerts for applications and incidents near here
Timeline
- 26 April 2013 Planning application submitted
- 21 August 2013 Planning permission refused
- 16 September 2013 Appeal lodged
- 15 January 2015 Refused by the Secretary of State
- 15 January 2015 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Upper Vaunces Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Upper Vaunces Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Upper Vaunces Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Upper Vaunces Wind Farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 9 March 2015.
- Where is Upper Vaunces Wind Farm?
- 8.1 km north-east of Diss, Norfolk, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).