Battery storage · United Kingdom

University Of Buckingham Campus, Energy Storage System

Operator AMP Energy Services Limited · Owner Fossa Holdco Limited

Application Withdrawn0.2 MWData checked 16 November 2026Source record dated 23 May 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

University Of Buckingham Campus, Energy Storage System is a 0.2 MW battery storage site in Buckingham, United Kingdom. Its planning application (23/00894/APP) went to Buckinghamshire on 24 March 2023 and was withdrawn on 22 May 2023. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 35 other energy sites within 10 km, 7 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 59 other sites and 562 energy sites within 40 km for University Of Buckingham Campus, Energy Storage System

Members see the sites and incidents around this one, and every record behind them.

AMP ENERGY SERVICES LIMITED (07342849), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
AMP Energy Services Limited
Owner
Fossa Holdco Limited
Location
University Of Buckingham Campus, Chandos Road, Buckingham, Buckinghamshire, MK18 1AL, United Kingdom
Planning authority
Buckinghamshire
Planning application
23/00894/APP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00894/APP, with what the planning evidence pack adds for this site.

Every application in Buckinghamshire · Alerts for applications and incidents near here

  • 24 March 2023 Planning application submitted
  • 22 May 2023 Application withdrawn

None found. The register holds no published incident that names University Of Buckingham Campus, Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has University Of Buckingham Campus, Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names University Of Buckingham Campus, Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of University Of Buckingham Campus, Energy Storage System?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 23 May 2023.
Where is University Of Buckingham Campus, Energy Storage System?
In Buckingham, United Kingdom (postcode MK18 1AL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).