Solar · United Kingdom

University Campus, Heronbank North - Phase 2 - Solar Panels

Operator Ivegate

Application Submitted1.1 MWData checked 16 November 2026Source record dated 17 July 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

University Campus, Heronbank North - Phase 2 - Solar Panels is a 1.1 MW solar farm 3.6 km north-east of Kenilworth, West Midlands, United Kingdom. Its planning application (W/26/0561) went to Coventry on 23 April 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 62 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

IVEGATE LIMITED (07562971), active, since 2011. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for University Campus, Heronbank North - Phase 2 - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 23 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college23 kmMinor
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property43 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge45 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Ivegate
Location
Hb104.8, Heronbank North, Scarman Road, West Midlands, CV4 7ES, United Kingdom
Planning authority
Coventry
Planning application
W/26/0561

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for W/26/0561, with what the planning evidence pack adds for this site.

Every application in Coventry · Alerts for applications and incidents near here

  • 23 April 2026 Planning application submitted

None found. The register holds no published incident that names University Campus, Heronbank North - Phase 2 - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has University Campus, Heronbank North - Phase 2 - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names University Campus, Heronbank North - Phase 2 - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of University Campus, Heronbank North - Phase 2 - Solar Panels?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 17 July 2026.
Where is University Campus, Heronbank North - Phase 2 - Solar Panels?
3.6 km north-east of Kenilworth, West Midlands, United Kingdom (postcode CV4 7ES).