Solar · United Kingdom

Automotive Trim Developments, Priory Mill - Solar Panels

Operator Sandford

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 13 June 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Automotive Trim Developments, Priory Mill - Solar Panels is a 0.4 MW solar farm 3.8 km east of Balsall Common, West Midlands, United Kingdom. Its planning application (PL/2024/0000671/PAPV) went to Coventry on 9 April 2024 and was granted on 3 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 65 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Automotive Trim Developments, Priory Mill - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college20 kmMinor
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property45 kmSignificant
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home45 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Sandford
Location
Unit 1, Priory Mill, Charter Avenue, West Midlands, CV4 8AF, United Kingdom
Planning authority
Coventry
Planning application
PL/2024/0000671/PAPV

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2024/0000671/PAPV, with what the planning evidence pack adds for this site.

Every application in Coventry · Alerts for applications and incidents near here

  • 9 April 2024 Planning application submitted
  • 3 June 2024 Planning permission granted

None found. The register holds no published incident that names Automotive Trim Developments, Priory Mill - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Automotive Trim Developments, Priory Mill - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Automotive Trim Developments, Priory Mill - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Automotive Trim Developments, Priory Mill - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 June 2024.
Where is Automotive Trim Developments, Priory Mill - Solar Panels?
3.8 km east of Balsall Common, West Midlands, United Kingdom (postcode CV4 8AF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).