Planning pack for this site, £295Other options

Solar · United Kingdom

Unit S, Gildersome Spur, Gildersome - Solar Panels

Operator CEB Services Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 19 October 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Unit S, Gildersome Spur, Gildersome - Solar Panels is a 0.2 MW solar farm on the edge of Morley, West Yorkshire, United Kingdom. Its planning application (22/05829/DPD) went to Leeds on 25 August 2022 and was granted on 14 October 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 82 other energy sites within 10 km, 60 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Unit S, Gildersome Spur, Gildersome - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2771, Fire involves rooftop solar panels and lithium batteries on Bradford house roof, 7.2 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof7.2 kmMinor
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster51 kmSignificant
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school65 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
CEB Services Limited
Location
Unit S Gildersome Spur Gildersome Morley, West Yorkshire, LS27 7JZ, United Kingdom
Planning authority
Leeds
Planning application
22/05829/DPD

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/05829/DPD, with what the planning evidence pack adds for this site.

Every application in Leeds · Alerts for applications and incidents near here

  • 25 August 2022 Planning application submitted
  • 14 October 2022 Planning permission granted

None found. The register holds no published incident that names Unit S, Gildersome Spur, Gildersome - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Unit S, Gildersome Spur, Gildersome - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Unit S, Gildersome Spur, Gildersome - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Unit S, Gildersome Spur, Gildersome - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 October 2022.
Where is Unit S, Gildersome Spur, Gildersome - Solar Panels?
On the edge of Morley, West Yorkshire, United Kingdom (postcode LS27 7JZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).