Unit B, Progress Way - Solar Panels

Operator Prologis UK Limited

RevisedData checked 16 November 2026Source record dated 1 March 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Unit B, Progress Way - Solar Panels is a solar farm on the edge of Chelmsley Wood, West Midlands, United Kingdom. Its planning application (PL/2023/01263/PPFL) went to Solihull on 9 June 2023 and was granted on 3 August 2023. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 79 other energy sites within 10 km, 59 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PROLOGIS UK LIMITED (02872273), active, since 1993. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Unit B, Progress Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 8.4 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college8.4 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home40 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge50 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Revised
Operator or applicant
Prologis UK Limited
Location
Unit B, Progress Way, Marston Green, Birmingham, West Midlands, B40 1AB, United Kingdom
Planning authority
Solihull
Planning application
PL/2023/01263/PPFL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2023/01263/PPFL, with what the planning evidence pack adds for this site.

Every application in Solihull · Alerts for applications and incidents near here

  • 9 June 2023 Planning application submitted
  • 3 August 2023 Planning permission granted
  • 3 August 2026 Planning permission expired

None found. The register holds no published incident that names Unit B, Progress Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Unit B, Progress Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Unit B, Progress Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Unit B, Progress Way - Solar Panels?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 1 March 2024.
Where is Unit B, Progress Way - Solar Panels?
On the edge of Chelmsley Wood, West Midlands, United Kingdom (postcode B40 1AB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).