Prologis DC4 Marston Gate, Brockley Way - Solar Panels

Operator Prologis UK Limited

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 2 April 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Prologis DC4 Marston Gate, Brockley Way - Solar Panels is a 0.4 MW solar farm 4.2 km south of Cranfield, Bedfordshire, United Kingdom. Its planning application (CB/24/00833/PASP) went to Central Bedfordshire on 21 March 2024 and was granted on 16 May 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 64 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PROLOGIS UK LIMITED (02872273), active, since 1993. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Prologis DC4 Marston Gate, Brockley Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof18 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough31 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering42 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Prologis UK Limited
Location
Prologis Marston Gate DC4, Unit 1 Brockley Way, Brogborough, Bedfordshire, MK43 0ZY, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/24/00833/PASP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/24/00833/PASP, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 21 March 2024 Planning application submitted
  • 16 May 2024 Planning permission granted

None found. The register holds no published incident that names Prologis DC4 Marston Gate, Brockley Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Prologis DC4 Marston Gate, Brockley Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Prologis DC4 Marston Gate, Brockley Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Prologis DC4 Marston Gate, Brockley Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 April 2024.
Where is Prologis DC4 Marston Gate, Brockley Way - Solar Panels?
4.2 km south of Cranfield, Bedfordshire, United Kingdom (postcode MK43 0ZY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).