Planning pack for this site, £295Other options

Solar · United Kingdom

Unit 4, Industrial Site - Solar Panels

Operator Private Developer

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 6 March 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Unit 4, Industrial Site - Solar Panels is a 0.2 MW solar farm 21 km south-west of Dumfries, United Kingdom. Its planning application (23/2403/FUL) went to Dumfries and Galloway on 9 January 2024 and was granted on 28 February 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 7 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Unit 4, Industrial Site - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 86 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20162022Solar panel fire evacuates Hawick High School86 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline130 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland143 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
Jas P Wilson Coast Road, Dumfries and Galloway, DG5 4QU, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
23/2403/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/2403/FUL, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 28 February 2019 Planning permission expired
  • 9 January 2024 Planning application submitted
  • 28 February 2024 Planning permission granted

None found. The register holds no published incident that names Unit 4, Industrial Site - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Unit 4, Industrial Site - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Unit 4, Industrial Site - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Unit 4, Industrial Site - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 March 2024.
Where is Unit 4, Industrial Site - Solar Panels?
21 km south-west of Dumfries, United Kingdom (postcode DG5 4QU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).