← Back to West Sussex
Planning pack for this site, £295Other options

Solar · United Kingdom

Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array

Operator Hollywood Bowl Group

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 22 March 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array is a 0.2 MW solar farm in Crawley, West Sussex, United Kingdom. Its planning application (CR/2022/0125/P14) went to Crawley on 14 March 2022 and was granted on 27 May 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 30 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

HOLLYWOOD BOWL GROUP PLC (10229630), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2447, Inverter fire on rooftop solar equipment at Sainsbury's store in Sutton, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-24472024Inverter fire on rooftop solar equipment at Sainsbury's store in Sutton26 kmMinor
EIR-15122024Solar panels involved in fire at school in Carshalton27 kmMinor
EIR-15222026Fire damages roof with one solar panel in The Charltons29 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Hollywood Bowl Group
Location
Unit 2, Hollywood Bowl, Crawley Leisure Park, London Road, West Green, Crawley, West Sussex, RH10 8LR, United Kingdom
Planning authority
Crawley
Planning application
CR/2022/0125/P14

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CR/2022/0125/P14, with what the planning evidence pack adds for this site.

Every application in Crawley · Alerts for applications and incidents near here

  • 14 March 2022 Planning application submitted
  • 27 May 2022 Planning permission granted

None found. The register holds no published incident that names Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 22 March 2022.
Where is Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array?
In Crawley, West Sussex, United Kingdom (postcode RH10 8LR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).