Onshore wind · United Kingdom
Uisenis Wind Farm
Operator Uisenis Power Limited
Awaiting Construction165 MWData checked 16 November 2026Source record dated 1 October 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Uisenis Wind Farm is a 165 MW wind farm 21 km south-west of Stornoway, Islands, United Kingdom. Its planning application went to Scottish Government (S36) on 22 August 2023 and was granted on 18 September 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Uisenis Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Uisenis Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 202 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 202 km | Significant |
| EIR-0063 | 2024 | Fatal fall from turbine nacelle during onshore wind maintenance, UK | 202 km | Major |
| EIR-0032 | 2017 | Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment | 202 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 165 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Uisenis Power Limited
- Location
- Sw/O Stornoway, Isle of Lewis, Islands, HS1, United Kingdom
- Planning authority
- Scottish Government (S36)
- Turbines
- 25, 200 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 22 August 2023 Planning application submitted
- 18 September 2025 Planning permission granted
- 18 September 2030 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Uisenis Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Uisenis Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Uisenis Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Uisenis Wind Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 October 2025.
- Where is Uisenis Wind Farm?
- 21 km south-west of Stornoway, Islands, United Kingdom (postcode HS1).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).