← Back to Islands
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Uisenis Wind Farm

Operator Uisenis Power Limited

Awaiting Construction165 MWData checked 16 November 2026Source record dated 1 October 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Uisenis Wind Farm is a 165 MW wind farm 21 km south-west of Stornoway, Islands, United Kingdom. Its planning application went to Scottish Government (S36) on 22 August 2023 and was granted on 18 September 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Uisenis Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 202 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm202 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK202 kmMajor
EIR-00322017Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment202 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
165 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Uisenis Power Limited
Location
Sw/O Stornoway, Isle of Lewis, Islands, HS1, United Kingdom
Planning authority
Scottish Government (S36)
Turbines
25, 200 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 22 August 2023 Planning application submitted
  • 18 September 2025 Planning permission granted
  • 18 September 2030 Planning permission runs out

None found. The register holds no published incident that names Uisenis Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Uisenis Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Uisenis Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Uisenis Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 October 2025.
Where is Uisenis Wind Farm?
21 km south-west of Stornoway, Islands, United Kingdom (postcode HS1).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).