← Back to Paraná

Solar · Brazil

UIA4

Operational1.1 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

UIA4 is a 1.1 MW solar farm Marechal Cândido Rondon, Paraná, Brazil. It first operated in 2026. Its status in the SIGA generation register (ANEEL, Brazil) is operational. The register holds no incident at this site. It holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil, and 480 worldwide.

Everything on this page

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.1 MW
Capacity figure from
SIGA generation register (ANEEL, Brazil)
Status
Operational (Operação)
Location
Marechal Cândido Rondon, Paraná, Brazil
First operating
2026

  • 1 April 2026 Operational

None found. The register holds no published incident that names UIA4. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has UIA4 had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names UIA4; it holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil.
What is the status of UIA4?
Operational, in the SIGA generation register (ANEEL, Brazil).
Where is UIA4?
Marechal Cândido Rondon, Paraná, Brazil.

Source: ANEEL, Sistema de Informacoes de Geracao (SIGA), Open Data Commons Open Database Licence (ODbL), dadosabertos.aneel.gov.br. The dataset. The register adds only the incidents and the counts.