← Back to Shropshire

Solar · United Kingdom

Twemlows

Operator Sunsave 27 (Twemlows)& Vogt solar

Operational10 MWData checked 16 November 2026Source record dated 1 February 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Twemlows is a 10 MW solar farm 4.2 km south-east of Whitchurch, Shropshire, United Kingdom. Its planning application (14/03957/FUL) went to Shropshire on 8 September 2014 and was granted on 20 February 2015. It has been operating since 15 November 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

365 energy sites within 40 km for Twemlows

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Sunsave 27 (Twemlows)& Vogt solar
Location
Land On Runway At Twemlows Hall, Higher Heath, Whitchurch, Shropshire, Shropshire, United Kingdom
Planning authority
Shropshire
Planning application
14/03957/FUL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/03957/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 8 September 2014 Planning application submitted
  • 20 February 2015 Planning permission granted
  • 15 August 2015 Construction started
  • 15 November 2015 Operational

None found. The register holds no published incident that names Twemlows. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Twemlows had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Twemlows; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Twemlows?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 February 2016.
Where is Twemlows?
4.2 km south-east of Whitchurch, Shropshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).