Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Turbine Development in Ballynahinch

Operator Private Developer

Awaiting ConstructionData checked 16 November 2026Source record dated 2 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Turbine Development in Ballynahinch is a wind farm 5.6 km south-east of Ballynahinch, Co. Newry Mourne & Down, United Kingdom. Its planning application (LA07/2023/3235/F) was submitted on 10 August 2023 and was granted on 19 January 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 2 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Turbine Development in Ballynahinch sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1038, Wind turbine reported to have collapsed in Northern Ireland during severe storm, 76 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm76 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire107 kmSignificant
EIR-04222025Wind turbine fire prompts fire service response in Fermanagh113 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
590m South East of No 69, Newcastle Road, Ballynahinch, Co. Newry Mourne & Down, BT24 8NF, United Kingdom
Planning application
LA07/2023/3235/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA07/2023/3235/F, with what the planning evidence pack adds for this site.

Alerts for applications and incidents near here

  • 10 August 2023 Planning application submitted
  • 19 January 2026 Planning permission granted
  • 19 January 2031 Planning permission runs out

None found. The register holds no published incident that names Turbine Development in Ballynahinch. If you know of one, report it (confidential reports are anonymised).

Has Turbine Development in Ballynahinch had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Turbine Development in Ballynahinch; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Turbine Development in Ballynahinch?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 February 2026.
Where is Turbine Development in Ballynahinch?
5.6 km south-east of Ballynahinch, Co. Newry Mourne & Down, United Kingdom (postcode BT24 8NF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).