Onshore wind · United Kingdom
Tullo Farm
Operator West Coast Energy (agents for Tullo Wind Ltd and GE Wind)
Operational17.5 MWData checked 16 November 2026Source record dated 28 October 2010
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tullo Farm is a 17.5 MW wind farm in Stonehaven, Grampian, United Kingdom. Its planning application (APP/2003/0756) went to Aberdeenshire on 13 October 2003 and was granted on 30 June 2004. It has been operating since 7 September 2010. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Tullo Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
28 settled days to 4 Nov: 1,181 MWh, running 70% of half hours, peak 8 MW of 18, load factor 10%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £8,313 at its earnings over the last 28 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The site
- Technology
- Onshore wind
- Capacity
- 17.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- West Coast Energy (agents for Tullo Wind Ltd and GE Wind)
- Location
- Tullo Farm, Laurencekirk, AberdeenshireGarvockLaurencekirk, Grampian, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2003/0756
- First operating
- 2010
- Turbines
- 7
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2003/0756, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 13 October 2003 Planning application submitted
- 30 June 2004 Planning permission granted
- 1 April 2010 Construction started
- 7 September 2010 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Tullo Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Tullo Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tullo Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Tullo Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 October 2010.
- Where is Tullo Farm?
- In Stonehaven, Grampian, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).