TS Power Plant

Operator Nevada Gold Energy, LLC

Operational200 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

TS Power Plant is a 200 MW solar farm Eureka County, Nevada, United States. It first operated in 2024. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

2 energy sites within 40 km for TS Power Plant

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
200 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Nevada Gold Energy, LLC
Owner
Nevada Gold Energy, LLC
Location
Eureka County, Nevada, United States
First operating
2024
Balancing authority
NEVP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names TS Power Plant. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has TS Power Plant had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names TS Power Plant; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of TS Power Plant?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is TS Power Plant?
Eureka County, Nevada, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.