Around this site

← Back to Gujarat

Solar · India

Torrent Gujarat solar farm

Planned (permitted)150 MWChecked 8 October 2026Last changed in the dataset 6 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Torrent Gujarat solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
150 MW
Status
Planned (permitted) (Pre-construction)
Owner
Torrent Power Ltd
Location
Surel, Surendranagar, Gujarat, India
First operating
2026

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Torrent Gujarat solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.